← Back to skills and knowledge
Ensure removal of all obstacles, snow and any other debris from railway tracks, rail switches, etc., to ensure maximum rail safety and functionality.
No related items available.
Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or the European Education and Culture Executive Agency (EACEA). Neither the European Union nor EACEA can be held responsible for them.
Project Number:
101104680-HABITABLE-ERASMUS-EDU-2022-PEX-COVE