← Back to skills and knowledge
Lay strips of various materials to separate different coloured sections of terrazzo flooring. Interpret the plan to determine the correct positions. Mark the positions and attach the strips to the floor.
No related items available.
Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or the European Education and Culture Executive Agency (EACEA). Neither the European Union nor EACEA can be held responsible for them.
Project Number:
101104680-HABITABLE-ERASMUS-EDU-2022-PEX-COVE