← Back to skills and knowledge
Dewater a suitable area through the construction of a diversion tunnel and use earthmoving equipment to build a coffer dam. Remove rocks and rubble in order to construct a plant, which uses concrete to prevent water leakages by using waterstops.
Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or the European Education and Culture Executive Agency (EACEA). Neither the European Union nor EACEA can be held responsible for them.
Project Number:
101104680-HABITABLE-ERASMUS-EDU-2022-PEX-COVE