← Back to skills and knowledge
Prepare the construction pit and guide the pipeline used to place the concrete mix underwater in a process called tremie. Ensure a continuous flow of concrete to avoid water going up the pipeline.
No related items available.
Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or the European Education and Culture Executive Agency (EACEA). Neither the European Union nor EACEA can be held responsible for them.
Project Number:
101104680-HABITABLE-ERASMUS-EDU-2022-PEX-COVE